Virtual Design and Construction (VDC) support tailored for general contractors. Mitigate risk, eliminate field conflicts, and improve constructability before breaking ground.
Our BIM coordination services empower general contractors and construction managers with the spatial intelligence needed to prevent on-site rework and stay on schedule.
We act as your virtual design and construction (VDC) partner. From running clash detection meetings via Navisworks to generating constructability reports, we ensure the MEP systems and structural elements fit perfectly before the concrete is poured.
Comprehensive, end-to-end production support tailored to your project requirements and quality standards.
Leading multi-disciplinary coordination meetings and federating subcontractor models in Navisworks.
Hard and soft clash detection with prioritized reporting and issue tracking via Procore or BIM Track.
3D modeling of site constraints, cranes, scaffolding, and laydown areas for precise site planning.
Linking Primavera P6 or MS Project schedules to the 3D model to visualize the construction sequence.
Extracting highly accurate material quantities directly from the model to support estimating teams.
Proactive identification of design gaps and constructability issues prior to issuing subcontractor packages.
Tell us what you need and our team will get back to you within 24 hours. Request pricing, a sample, or both.
From brief to delivery — a seamless, transparent workflow that integrates into your existing systems.
Virtual Design and Construction (VDC) is the management of integrated multi-disciplinary performance models of design-construction projects. It heavily relies on BIM to optimize the construction schedule and budget.
By identifying spatial overlaps (e.g., an HVAC duct hitting a structural beam) in the 3D model during pre-construction, contractors avoid discovering these conflicts on-site, which prevents costly rework, material waste, and schedule delays.
Yes, our BIM coordinators can host regular clash resolution meetings with your subcontractors, guiding them through the Navisworks model to resolve issues collaboratively.
Yes, we can link the 3D BIM model elements to your construction schedule (Primavera P6 or MS Project) to simulate the construction sequence over time (4D BIM).
Yes, we federate the detailed models provided by your steel and MEP subcontractors against the primary architectural model to verify alignment.
Send us your project brief and receive a detailed, fixed-price quote within 24 hours.